Location:
Customer cases
Current location:
Customer cases
SuccessCase
Production line configuration: Crushing and recycling system (Powerful crusher + Sorting and conveying)
Washing and dewatering system:(Friction washing + Centrifugal dewatering)
Melting, extrusion and pelletizing system:(Extruder + Automatic screen changer + Water - ring pelletizing + Air - conveying cooling)
Installation highlights:Integrated design of the whole line to achieve continuous production in the whole process from crushing, washing to pelletizing;
Use energy - saving extruders and heat recovery systems to reduce energy consumption by about 20%;
Complete the environmental dust removal and noise control configuration synchronously during the installation process, meeting the green production standards;
Customer feedback:\u201CThe whole line runs stably, the particle uniformity reaches over 98%, and the daily processing capacity exceeds 12 tons, truly achieving efficient and clean production.
  • Screen changer installed successfully
  • Vertical mixer installed successfully
  • Environmental granulator packed and shipped
  • Screen changer packed and shipped
  • 180 granulator packed and shipped
  • Power distribution cabinet installed successfully
  • 470 vertical dehydrator installed successfully
  • Crusher installed successfully
  • Vertical dehydrator installed successfully
  • Iron removal conveyor installed successfully
  • Feeder installed successfully
ExhibitionCase

Documentary of the exhibition cases of Changsha Jinli Mechanical Equipment Technology Co., Ltd.

At this exhibition, Jinli Machinery presented itself with Intelligent Drive · Green Manufacturing as the theme, focusing on two major business segments: recycling resource processing and precision machining. The key exhibits are as follows:

Plastic recycling processing system: including high - efficiency crushing and recycling production lines and energy - saving pelletizing complete sets of equipment;

After the exhibition, the company has organized a special follow - up team:

To provide customers with customized solution design and factory inspection arrangements; plan to hold special technical exchange meetings in Chengdu and Chongqing; strengthen the construction of after - sales service outlets to ensure regional response speed.


  • Chuan-Yu Equipment Manufacturing Expo
  • Chuan-Yu Equipment Manufacturing Expo
Loading goods for shipmentCase
General situation of the goods: The whole production line includes more than 20 boxes/items of large components such as crushers, extruders, cooling systems, and electrical control cabinets, with a total volume exceeding 150 cubic meters.
Highlights of loading: Customized packing plan: Reasonable weight distribution to ensure stable center of gravity; Professional protection measures: Multi - layer protection with waterproof film + bubble film + anti - collision corners for key parts of the equipment (such as motors);
Mechanized loading: Use the factory crane and forklift to work together, and fix with flexible straps to avoid equipment displacement and collision.

Our standard process for shipping and loading

Pre - shipment inspection: Each piece of equipment undergoes final performance testing and appearance inspection before shipment; Scientific packing design: Customize the packaging and packing structure according to the equipment's size, weight, and sensitive parts; Standardized loading operation:
Customer feedback: After the equipment arrived, it was unpacked and inspected, and none of it was damaged. The customer praised it as "Professional packaging, firm fixation, and the goods arrived in good condition".
Crushing and cleaning line, friction machine, horizontal dehydrator loaded and shipped
Flower B material crushing and cleaning line loaded and shipped
Factory test runCase

Integrated test run of the whole line for the combined crushing and cleaning line

Test run configuration
: Powerful crusher (55kW) with screw conveyor + friction cleaning unit and high - speed dehydrator
Segmented testing + whole - line joint adjustment: First, verify the functions of single machines in segments, and then conduct the whole - line automated linkage operation; Multi - material adaptation test: Input different waste plastics of various materials such as HDPE hard materials, PP woven bags, and films in sequence to verify the system's adaptability and cleaning consistency; Accounting of water and electricity consumption and production capacity: Record the real - time water cycle utilization rate, electricity consumption, and processing volume per unit time to ensure that the indicators stipulated in the contract are met; Safety and environmental protection inspection: Detect the noise and dust dispersion situation and confirm the effectiveness of the protective devices. Test run results: The whole line runs continuously for 24 hours without failure, and the processing capacity is stable at 1.8 - 2.2 tons per hour; The residual impurities in the sliced materials after cleaning are less than 0.5%, and the moisture content is less than 3%;
Customers canWatch the test run process via remote video connection, and confirm the data of key nodes.

Our professional service process

Preliminary research: Customize solutions according to the customer's material characteristics, production capacity requirements, and site conditions; Installation and implementation: A project team composed of mechanical, electrical, and process engineers will carry out standardized operations throughout the process; Commissioning and training: Complete no - load and load commissioning, and provide systematic training for operators and maintenance personnel; Continuous support: Provide regular inspections and process optimization suggestions to ensure the long - term and efficient operation of the production line.
Contact us
contact us
Address
Yangque New Village, Jiangbei Town, Changsha County, Hunan Province
Phone
0731 - 89261111
Email
30826338@qq.com
Contact QQ
30826338